Layout change

In order to reduce the length of the coaxial cable from the antennas to the central receiver unit and also have equal coaxial cable from the stations to the CRU unit which is an essential part of future investigations, a special box were designed and built for the SURA experiment. This unit will hold the electronics and will be placed on the roof of the physics faculty.